Download our files Download RESEARCH AGENTS Opportunity of growth work with us

News

News archive
  • Tel. +39 0425 754 713
  • Tel. +39 0425 742 986
  • Tel. +39 0425 742 028
  • Fax +39 0425 741 130
  • info@mcelettronica.it
home  /  News Archive  /  RENOVATION OF LABORATORY FOR TESTING AND INSPECTION

RENOVATION OF LABORATORY FOR TESTING AND INSPECTION

« Precedente   Successivo »
« News Archive

The testing and inspection laboratory plays a key role at MC Elettronica. Qualified engineers can carry out all the necessary pre-compatibility tests to guarantee rigorous compliance with current standards and the quality of the finished product, based on specific requests by the Customer.

At the MC laboratory, it is possible to perform tests in a climatic chamber, with automatic monitoring of humidity and temperature, tests on a vibrating table to check resistance to mechanical stress, Burst tests and finally tests to determine the IP protection degree (according to EN/IEC 60529 rule) against dust and water infiltration, with dedicated tooling.

Once the laboratory trials and tests are completed, MC Elettronica has an in-house ANECHOIC CHAMBER that enables electromagnetic pre-compatibility testing of newly developed products, in compliance with European Directive 2004/108/EC and EN ISO 14982. The anechoic chamber enables the most rigorous measurements to be taken, thus guaranteeing the highest reliability and quality of newly developed products. MORE INFORMATIONS

Cookie's Policy